Wednesday 2nd December

Another blustery, low cloud, showery day. But it did mean that the Wednesday club got stuck in working on the glider workshop. Floor topcoat was smoothed, perimeter floor paint first coated and skirting trim fixed. Gutter leaks meant removal of that for replacement and the gaps left behind filled. All completed while the suspended ceiling installers worked away on mobile scaffold towers. They finished their task by close of play. Electricians should be back on Thursday to complete the wiring of the lights.
Floor painting is on for Saturday and Sunday together with fixing steelwork and replacement guttering. We should then be able to see it in use straight away for the K21 C of A.
Ian and Joe made a good job of replacing the repaired starter motor in the Pawnee.
The skies cleared, the sun came out and the Pawnee put to use doing half a dozen or so aerotows, until misting canopies stopped play.